HA1 – Land to the East of Abergavenny

SD255 HA1 & EA1k Accessible Footbridges Feasibility Study (July 2025)

SD256 HA1 & EA1k Accessible Footbridges Feasibility Study Option 1A and 1B – Ramp to Platform (July 2025)

SD257 HA1 & EA1k Accessible Footbridges Feasibility Study Option 1C – Extension to Access for All Bridge (July 2025)

SD258 HA1 & EA1k Accessible Footbridges Feasibility Study Option 2a – Firs Road Rail and Road Ramp (July 2025)

SD259 HA1 & EA1k Accessible Footbridges Feasibility Study Option 2b – Firs Ramp Cross Section (July 2025)

SD260 HA1 & EA1k Accessible Footbridges Feasibility Study Option 2b – Firs Road Ramp (July 2025)

SD261 HA1 & EA1k Accessible Footbridges Feasibility Study Option 2c – Stepped Firs Road Bridge (July 2025)

SD262 HA1 & EA1k Agricultural Land Classification Report (August 2021)

SD263 HA1 & EA1k Air Quality Constraints Assessment (August 2021)

SD264 HA1 & EA1k Archaeological Desk Based Assessment (August 2021)

SD265 HA1 & EA1k Constraints & Opportunities Plan (December 2024)

SD266 HA1 & EA1k Density Framework (December 2024)

SD267 HA1 & EA1k Development Framework Masterplan (December 2024)

SD268 HA1 & EA1k Drainage Strategy (August 2021)

SD269 HA1 & EA1k Environmental Noise and Vibration Assessment (August 2021)

SD270 HA1 & EA1k Geoenvironmental and Geotechnical Desk Based Assessment (August 2021)

SD271 HA1 & EA1k Land Use Framework (December 2024)

SD272 HA1 & EA1k Landscape Study for Site Promotion (August 2021)

SD273 HA1 & EA1k Lidar Data (August 2021)

SD274 HA1 & EA1k Location Plan (September 2024)

SD275 HA1 & EA1k Movement Framework (December 2024)

SD276 HA1 & EA1k Network Rail Letter (August 2024)

SD277 HA1 & EA1k Ownership Plan (August 2021)

SD278 HA1 & EA1k Placemaking Booklet (March 2025)

SD279 HA1 & EA1k Plan – A465 Speed Reduction (March 2025)

SD280 HA1 & EA1k Plan – Cross Section of the A465

SD281 HA1 & EA1k Plan – Proposed Access To Potential Rail Bus Park and Ride (February 2025)

SD282 HA1 & EA1k Plan – Proposed Signalled-Controlled Crossing A465 (February 2025)

SD283 HA1 & EA1k Plan – Traffic Calming – Gateway Feature A465 (February 2025)

SD284 HA1 & EA1k Preliminary Ecological Assessment (December 2024)

SD285 HA1 & EA1k Site Allocation Prospectus (August 2021)

SD286 HA1 & EA1k Transport Assessment (March 2025)

SD287 HA1 & EA1k Transport for Wales Letter (September 2024)

SD288 HA1 & EA1k Tree Survey (August 2021)

SD289 HA1 & EA1k Tree Survey Photographs Part 1 (July 2021)

SD290 HA1 & EA1k Tree Survey Photographs Part 2 (July 2021)

SD291 HA1 & EA1k Utilities Assessment (August 2021)

SD292 HA1 & EA1k Welsh Government Transport Letter (August 2024)

SD293 HA1 & EA1k WelTag Lite Abergavenny East Severance Study and Wider Links (May 2024)

HA2 – Land to the East of Caldicot/North of Portskewett

SD390 HA2 Noise Assessment (Bradbury Farm & Oak Grove Farm) (August 2021)

SD391 HA2 Development Prospectus (Bradbury Farm and Oak Grove Farm) (August 2021)

SD392 HA2 GI Plan (Bradbury Farm and Oak Grove Farm) (August 2021)

SD393 HA2 LVIA (Bradbury Farm and Oak Grove Farm) (August 2021)

SD394 HA2 LVIA Appendices (Bradbury Farm and Oak Grove Farm) (August 2021)

SD396 HA2 Air Quality Report (Bradbury Farm part & Oak Grove Farm) (August 2021)

SD397 HA2 Air Quality Technical Note (Bradbury Farm part & Oak Grove Farm) (August 2021)

SD398 HA2 Breeding Bird Technical Note (Bradbury Farm) (July 2024)

SD399 HA2 Wintering Bird Ecology Technical Note (Bradbury Farm) (March 2024)

SD400 HA2 Ecology Report (northern part of site Bradbury Farm inc Oak Grove Farm) (April 2020)

SD401 HA2 Agricultural Land Classification Report (Bradbury Farm & Oak Grove Farm) (August 2021)

SD402 HA2 Archaeological Desk-based Assessment (Bradbury Farm) (August 2020)

SD403 HA2 Detailed Framework Masterplan Rev D (Bradbury Farm) (August 2025)

SD404 HA2 Flood Risk and Drainage Statement (Bradbury Farm) (September 2025)

SD405 HA2 Geotechnical & Geoenvironmental Report (Bradbury Farm) (April 2020)

SD406 HA2 Surface Water Drainage Statement (Bradbury Farm) (September 2025)

SD407 HA2 Topographical Survey (1) (Bradbury Farm) (June 2020)

SD408 HA2 Topographical Survey (2) (Bradbury Farm) (June 2020)

SD409 HA2 Topographical Survey (3) (Bradbury Farm) (June 2020)

SD410 HA2 Topographical Survey (4) (Bradbury Farm) (June 2020)

SD411 HA2 Topographical Survey (5) (Bradbury Farm) (June 2020)

SD412 HA2 Ecology Report (Bradbury Farm southern and western area) (April 2020)

SD413 HA2 Agricultural Land Classification Report (The Showground) (May 2025)

SD414 HA2 Arboricultural Report (The Showground) (August 2024)

SD415 HA2 Comprehensive Masterplan (The Showground) (July 2024)

SD416 HA2 Design Note (The Showground) (July 2024)

SD417 HA2 Drainage Destination Form (The Showground) (June 2025)

SD418 HA2 Wintering Bird Ecology Technical Note (The Showground) (July 2024)

SD419 HA2 Electricity Capacity Statement (The Showground) (April 2024)

SD420 HA2 Flood Consequence Assessment (The Showground) (June 2025)

SD421 HA2 Heritage Assessment (The Showground) (July 2024)

SD422 HA2 Landscape & Visual Technical Note (The Showground) (July 2024)

SD423 HA2 Outline Drainage Strategy (The Showground) (December 2023)

SD424 HA2 Joint Drainage Technical Note (August 2024)

SD425 HA2 Joint Transport Assessment (September 2024)

SD426 HA2 Joint Travel Plan (October 2024)

HA3 – Land at Mounton Road, Chepstow

SD427 HA3 Acoustics Note (August 2021)

SD428 HA3  Agricultural Land Classification and Soil Resources (August 2021)

SD429 HA3 Air Quality Assessment (April 2024)

SD430 HA3 Arboricultural Baseline Note (February 2024)

SD431 HA3 Arboricultural Constraints Plan (February 2024)

SD432 HA3 Archaeology and Heritage Appraisal (August 2021)

SD433 HA3 Flood Consequence Assessment (FCA) Main Report (updated June 2025)

SD434 HA3 FCA Appendix A Concept Plan (updated June 2025)

SD435 HA3 FCA Appendix B Topographical Survey (updated June 2025)

SD436 HA3 FCA Appendix C Infiltration Assessment (updated June 2025)

SD437 HA3 FCA Appendix D Welsh Water Apparatus (updated June 2025)

SD438 HA3 FCA Appendix E Drainage Strategy (updated June 2025)

SD439 HA3 FCA Appendix F1 Infiltration Results (updated June 2025)

SD440 HA3 FCA Appendix F2 Infiltration Results (updated June 2025)

SD441 HA3 FCA Appendix F3 Infiltration Results (updated June 2025)

SD442 HA3 FCA Appendix F4 Infiltration Results (updated June 2025)

SD443 HA3 Geophysical Survey (April 2013)

SD444 HA3 GI Constraints and Opportunities Plan BL-M-01 (August 2021)

SD445 HA3 Landscape & Visual Impact Baseline (February 2024)

SD446 HA3 Location Plan BL-M-05 Rev E (August 2021)

SD447 HA3 Local Context Plan BL-M-07 (August 2021)

SD448 HA3 Masterplan – Concept Plan BL-M-11 Rev A (February 2024)

SD449 HA3 Preliminary Ecological Appraisal (August 2021)

SD450 HA3 Preliminary Ecological Appraisal Appendices (August 2021)

SD451 HA3 Transport Assessment (April 2024)

SD452 HA3 Surface Water Drainage Statement (June 2025)

HA7 – Land at Drewen Farm, Monmouth

Supporting documents relating to the proposed housing allocation HA7 Land at Drewen Farm, Monmouth, can be viewed via the planning application link: DM/2024/01295 – The development of up to 110 homes, subject to the signing of a S106 agreement, was granted outline planning permission on 09/09/2025.

HA8 – Land at Tudor Road, Wyesham, Monmouth

Supporting documents relating to the proposed housing allocation HA8 Land at Tudor Road, Wyesham, Monmouth, can be viewed via the planning application link: DM/2024/00557 – The development of 50 homes, was granted planning permission on 26/03/2025.

HA16 – Land North of Little Mill

Supporting documents relating to the proposed housing allocation HA16 Land North of Little Mill can be viewed via the planning application link DM/2020/01438 – The development of 15 dwellings (including 9 affordable and 6 open market homes), subject to the signing of a S106 agreement, was granted planning permission and approved on 17/09/2024.

EA1a – Land at Nantgavenny Business Park, Abergavenny

Supporting documents relating to the proposed employment allocation EA1a Land at Nantgavenny Business Park, Abergavenny can be viewed via the planning application link: DM/2025/00821 – The construction of 12 small starter industrial units, is currently pending consideration.

EA1d – Newhouse Industrial Estate, Chepstow

Supporting documents relating to the proposed employment allocation EA1d Newhouse Industrial Estate, Chepstow can be viewed via the planning application link: DM/2022/01155 – Hybrid application comprising of full planning for the erection of a roadside facility comprising of 2 drive through units and associated development; and an outline application for B2/B8 use classes, was approved on 31/05/2024.

EA1g – Rockfield Farm, Undy

Supporting documents relating to the proposed employment allocation EA1g Rockfield Farm, Undy can be viewed via the planning application links: DM/2016/00883 – The development of 13.8ha of land for residential use and employment use; up to 266 proposed residential units and approximately 5575sqm of B1 floor space, was approved on 20/03/2018; DM/2021/00358 – The provision of B1 employment space on parcel C1, is currently pending consideration.

EA1k – Land to the East of Abergavenny

For supporting documents relating to the proposed employment allocation EA1k Land to the East of Abergavenny, please see supporting documents for the proposed residential allocation HA1 Land to the East of Abergavenny.

EA1l – Land at Former MOD Site, Caerwent

For supporting documents relating to the proposed employment allocation EA1l Land at Former MOD Site, Caerwent, please see supporting documents for the proposed residential allocation HA9 Land at Former MOD Site, Caerwent.

EA1m – Land to the East of Caldicot/North of Portskewett

For supporting documents relating to the proposed employment allocation EA1m Land to the East of Caldicot/North of Portskewett, please see supporting documents for the proposed residential allocation HA2 Land to the East of Caldicot/North of Portskewett.

CC2 – Raglan Enterprise Park, Raglan

For supporting documents relating to the proposed renewable energy allocation CC2 Raglan Enterprise Park, Raglan, please see supporting documents for the proposed employment allocation EA1i Raglan Enterprise Park, Raglan.

How Do I Stay Informed?